Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Times of India
The Times of India
World
TOI World Desk

Wisconsin homeowner fights data-center power line over land and $81K offer

For more than three decades, Jerry Zelenka and his wife have built their Wisconsin property piece by piece, turning raw land into a home surrounded by trees, barns and working outbuildings. Now, a proposed transmission line tied to a planned data center in nearby Port Washington could dramatically alter the property, leaving the 75-year-old homeowner facing the prospect of losing much of what he spent years creating. The Fredonia homeowner says American Transmission Co. has proposed a new route across his property, including a cleared corridor, the removal of six structures and a 130-foot transmission tower near his driveway. He intends to challenge the plan rather than voluntarily accept the terms, states an online report by Washington County Insider.

Get breaking news anytime, anywhere. Download the TOI app now!

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.