Get all your news in one place.
100's of premium titles.
One app.
Start reading
International Business Times
International Business Times

Turkey Taps Wison New Energies to Build Floating Production Unit for Landmark Sakarya Gas Field

Wison's Sakarya 3 floating production unit. (Credit: Wison New Energies)

Turkey's Turkish Petroleum Corporation has signed a contract with Wison New Energies to build a floating production unit (FPU) for Phase 3 of the Sakarya Gas Field, the country's largest-ever natural gas discovery.

The Sakarya field, located 170 kilometers offshore in the Black Sea, was discovered in August 2020 and holds an estimated 405 billion cubic meters of gas reserves. The new FPU, designed to withstand deepwater operations at depths of over 2,150 meters and navigate the Bosphorus Strait's tight 56-meter air draft restriction, will be a centerpiece of the third phase of development.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.