RAJAMAHENDRAVARAM
A technical glitch has been detected on the fourth bridge, locally known as Gammon Bridge, between Rajamahendravaram city and Kovvuru town across Godavari river. Built by Gammon India Limited, the bridge was commissioned in 2015.
A high-level team led by Principal Secretary (Transport, Roads and Buildings) P.S. Pradyumna on Monday inspected the bridge and confirmed the technical glitch which was identified as ‘failure of a bearing’ between the 56 and 57 piers. Roads and Buildings Chief Engineer L. Srinivasa Reddy, District Collector K. Madhavilatha, SP P. Jagadeesh and officials joined Mr. Pradyumna during the inspection.