Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Manchester Evening News
Manchester Evening News
World
George Lythgoe

Old school building to be bulldozed and replaced with 'eco' facility

An old school building will be bulldozed and replaced with an 'eco' facility.

The Byrchall High School site will open in autumn 2024, boasting outdoor cinema spaces, a science and technology 'learning environment' and multi-use sports facilities. The 1960s site in Ashton was one of four schools in Wigan that received a portion of the Department for Education's £1bn 'School Rebuilding Programme'.

Byrchall will be one of 50 new 'eco and self-sustainable schools' to be built in the UK over the next three years.

READ MORE: Teens in stolen car 'filmed' police during chase before driver, 14, died in crash, as jury rules pursuit was 'lawful'

The Warrington Road-based school has 1,200 pupils in a space that 'is no longer fit for purpose', according to a planning statement. The school will remain operational as building work is done, with development in phases.

New Byrchall High School entrance. (Wigan Council)

The new building is planned on sports pitches and open spaces. Byrchall shares pitches with neighbouring school St Edmund Arrowsmith.

Headteacher Alan Birchall said: “We are very excited to welcome all of our students and families into a building that reflects not only our traditional values, but our modern practices and supports the success of every individual in our community. As the self sustainable school building takes shape, students will learn about how the use of reusable energy sources will power everything from the lights in their classrooms to the gas in their Bunsen burners - learning to live sustainably now and in the future.”

Artist impression of new Byrchall High School building (Wigan Council)

This is yet another win for the school that celebrated a ‘Good’ Ofsted report in October 2022. Now they can look forward to a greener future with solar panels planned for the three-storey new-build’s roof.

“The design concept is to provide a modern school facility, contemporary in design, housed within a U-shaped block,” a report said.

Artist impression of new Byrchall High School building (Wigan Council)

“The building would be a maximum three-storeys in height, with a stepped design, reducing to two storey to the north section.

“The design accommodates plant and machinery and renewable energy facilities within the flat roof.”

Read more of today's top stories here

READ NEXT:

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.