Get all your news in one place.
100's of premium titles.
One app.
Start reading
Tom’s Hardware
Tom’s Hardware
Technology
Luke James

Micron's $24 billion Singapore fab could need 500 transformers, more than double the output of any single manufacturer — heavy electrical infrastructure the latest AI buildout bottleneck

Micron.

Micron’s planned $24 billion NAND flash expansion in Singapore will require 400 to 500 power transformers, which is more than double the 100 to 150 units a standard wafer fab typically needs, according to industry sources as reported by DigiTimes. The scale exceeds the annual output capacity of any single Taiwanese transformer manufacturer, turning heavy electrical equipment into a bottleneck for AI-driven semiconductor buildouts.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.