Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Times of India
The Times of India
World

Maryland Bridge Project Savings: Precast slabs cut work from 15 to 3 months; study estimates $1.49 million gain

On a typical rural bridge replacement, school bus routes are disrupted, traffic creeps through a single lane managed by temporary lights, and the work drags on for more than a year. In the summer of 2008, the Maryland State Highway Administration tried a different approach on two deteriorating bridges. It had the new spans built in a factory, shut down both highways entirely, and gave the contractor a bonus for finishing ahead of schedule.

Get breaking news anytime, anywhere. Download the TOI app now!

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.