KOLKATA: Trial runs for major traffic diversions that will kick in from next month to facilitate two major projects — one at Chingrighata crossing (for the Metro pillar construction) and another at KK Tagore Street (for Posta flyover demolition) — is set to begin in three weeks.
Lalbazar wants a demo run around KK Tagore Street-Rabindra Sarani between January 23 to January 26 stating that it was the ideal time to carry out experiments. “KMDA wanted to begin the third phase of work on KK Tagore Street along with the second phase.