One of the three shutters of the Parambikulam dam in Palakkad district of Kerala was damaged around 2 a.m. on Wednesday, resulting in a flow of 16,000 cusecs of water towards Athirapally.
Water Resources Organisation (WRO) of the Public Works Department of Tamil Nadu have commenced works on war footing to repair the damaged shutter. Though the dam is in Kerala, the maintenance of the same rests with Tamil Nadu. Chief Engineer - Operations and Maintenance team had reached the dam site in Palakkad district.
The shutter which is usually raised by 10 cm, automatically opened for the entire height of 25 ft. Engineers with the WRO pointed out that a chain cut, resulted in the counter-weight resting on the shutters, thus opening it.