Plans for dramatic changes to one of Scotland’s first onshore windfarms have been lodged with the Scottish Government.
Fred Olsen Renewables is looking to remove 36 turbines from Windy Standard in the Glenkens and replace them with eight turbines up to 200 metres tall.
The firm first unveiled plans to overhaul the development in 2021 with as many as nine turbines being proposed.