CHENNAI: Metrowater (CMWSSB) has told the National Green Tribunal (NGT) that 78% of underground sewerage system (UGSS) work in Ramapuram area has been completed till date.
The agency is planning to finish the remaining work before March 2023, so that no sewage will be let into stormwater drains or Porur lake.