Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Times of India
The Times of India
World
TOI World Desk

1977 Washington Road Project: recycled asphalt lasts 16 years vs 10; FHWA urges careful evaluation

Road construction often involves removing worn-out pavement and replacing it with fresh materials. Old asphalt does not have to become waste, however. It can be processed and reused for road surfacing, which saves virgin materials for other uses. Washington State considered such an alternative in the 1970s, a period of rising construction costs and oil prices. A road rehabilitation project it carried out in 1977 produced notable results. The Federal Highway Administration (FHWA) reported that the recycled hot-mix asphalt provided 16 years of actual service, compared with 10 years for the original layer it replaced.

Get breaking news anytime, anywhere. Download the TOI app now!

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.