
The Mitchell Street seawall on Stockton beach is now complete as works progress on a new 50 metre rock bag structure to protect the coastline.
Rock bags will be integrated into future works to reduce the risk of damage at The Pines, which is the area surrounding the war memorial on Mitchell Street. Design and assessment is now underway for works in this area.