Plans for the UK's first all-season beach have been revealed inside the huge Therme Manchester indoor resort and spa coming to TraffordCity. New images of the extraordinary indoor beach, which will include lapping waves on soft sands, have been released today for the first time.
It is part of a series of detailed new additions to the existing plans for the spectacular £250m well-being resort and waterpark that will boast an incredible 20 pools and 35 water slides. It will be built where Event City currently sits next to the Trafford Centre, although the anticipated opening for late 2023 has now been set back to 2025.
New CGI images of how the site will look have been released ahead of Therme's sponsorship of this year's Manchester Marathon, which takes place on Sunday in the city. The "urban beach" element at the resort will be part of Therme's "next generation waterpark" with an array of water slides, thermal bathing and a wellbeing spa.