Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

Timings of 314 South Western Railway trains revised

The timings of 314 trains of the 568 trains running in the South Western Railway have been revised.

Addressing the media, Kusuma Hariprasad, Additional Divisional Railway Manager (Admin), Bengaluru Division, on Tuesday (Oct. 3) highlighted the major changes in the running pattern of trains that are operated from the Bengaluru Division with effect from October 1, 2023.

She said that the passenger timetable revision is done annually in October in consultation with other railway zones.

She said the Bengaluru Division operates a total of 396 trains; and on average 264 trains are run every day, out of which 205 are express and 59 are passenger trains.

Ms. Hariprasad said four pairs of new trains have been introduced, the frequency of one pair of trains has been increased and three pairs of trains have been extended, according to a release from SWR, Bengaluru Division.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.