Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

Steps sought to ensure safety of differently abled people using footpaths

The State Commissionerate for Persons With Disabilities has initiated suo motu proceedings against Kochi Metro Rail Limited (KMRL), citing media reports on the delay in relocating electric posts and other utilities from footpaths that are being renovated in Kochi as part of the metro agency’s non-motorised transport (NMT) initiatives.

The agency is engaged in renovating footpaths and the median of Kaloor-Kadavanthra Road owned by the Greater Cochin Development Authority and footpaths on either side of the Manorama Junction-Thripunithura metro corridor.

The Commissionerate initiated action since it was found that electric posts and other utilities were yet to be removed from stretches where tactile tiles were laid to guide visually challenged people. Such people stand the risk of ramming structures that hamper safe movement on footpaths, said S.H. Panchapakeshan, Commissioner for Persons With Disabilities.

A notice in this regard will be sent to the metro agency, based on which it can file its version. Steps must be taken to ensure safe movement of pedestrians, especially differently abled persons. Agencies like the Kerala State Electricity Board are duty-bound to relocate posts and cables from footpaths if the metro agency deposits the requisite funds, he added.

Responding to the issue, KMRL sources said they were yet to receive any intimation from the Commissionerate. “No one has sent a complaint in this regard. We began footpath renovation works before posts and other utilities owned by multiple departments were relocated to avoid delay since we have to adhere to the January 2024 deadline. The works are being done as per Indian Roads Congress specifications,” they added.

Cochin Smart Mission Limited and the Kochi Corporation had faced flak for renovating footpaths in the city hub and on either side of Subhash Bose Road-Jawahar Nagar corridor without relocating posts, transformers, cables, and other utilities.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.