Bemused passengers at London Paddington who had followed advice to check trains before departure have discovered that the planned resumption of services has been delayed – with no certainty about when they might begin.
Engineering work outside the terminus has overrun, blocking the entrance to North Pole depot – meaning trains are trapped.