Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

Pipeline row: Kerala Water Authority constitutes team of engineers, prepares fresh schedule for completing work

The Kerala Water Authority (KWA) has constituted a team of engineers for resuming the laying of a sewage pipeline at Anayara on a war-footing. The team has been tasked with completing the work by July 6, as per a fresh schedule prepared by the KWA.

The work was halted several weeks ago after the horizontal directional drilling (HDD) machine, used for laying the pipes beneath the ground, developed a snag on its hydraulic motor. The delay triggered protests in the area as the pipes are dumped on a narrow road, causing inconvenience to the residents.

According to a KWA order, once the drill reaches Thiruvananthapuram after repairs, the pipe-laying work will be resumed with day-and-night shifts. The engineers’ team was formed on the instructions of Water Resources Minister Roshy Augustine.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.