Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Wales Online
Wales Online
National
Neil Shaw

People asked to turn appliances off between 5pm and 7pm tonight in system test

Britain’s electricity grid operator has asked two of its coal-fired power stations to start warming up as freezing weather conditions heap pressure on the UK’s power network - and people will be asked to reduce energy use tonight in a test of the system.

National Grid said it had asked the winter “contingency” plants to prepare for operation to “give the public confidence in Monday’s energy supply”. It said the move means the coal-fired stations can be used as “tools for additional contingency” as needed to allow the network to run as usual and stressed that people “should continue to use energy as normal”.

The UK faces its biggest test yet with the current cold snap – which has seen the country suffer freezing temperatures and snow in many areas – ramping up demand for power at a time when supplies are tight. UK next day electricity prices surged yesterday to help attract power imports through interconnectors from Europe and record prices are expected during the peak demand hours between 5pm and 7pm on Monday.

The instruction for the coal-fired plants marks the first since they were put on standby and comes as the grid said it will also run another test of its demand flexibility service – which pays customers to use less electricity during certain hours. On Monday, customers of some energy suppliers will be asked to reduce their consumption between 5pm and 7pm this evening.

National Grid says that the service is just a test and had already been planned for today, however, the timing will likely still be useful on a day when energy prices have shot up. Octopus Energy has promised that its customers can save more electricity than other suppliers, with Drax and Eon also saying they can provide significant savings for the grid.

The grid expects that the coal-fired stations will be ready for use if called upon for the evening between 5pm and 9pm, when demand is set to peak. The stations are operated by Drax in North Yorkshire and are two of five put on standby under so-called winter contingency contracts, with others run by EDF and Uniper.

The two units are each said to be capable of generating around 570 megawatts – adding more than 1.1 gigawatts to the grid if used.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.