The 15-day Pattana Pragathi programme came to a conclusion on Saturday, and has been termed by GHMC as a success.
Additional waste over and above normal has been collected and transported to the dump yard, and construction debris, waste and useless articles have been collected from door to door as part of the drive, a note from GHMC informed.
Construction of catchpits and de-silting works were intensified, so were the anti larval measures. The drive was held in 5,900 colonies and slums in 150 wards, the note said.