A £1.3 million sewerage treatment works at Palnackie Port is “at risk” amid claims unregulated dredging collapsed the harbour wall.
The Scottish Water plant, completed in 2013, was built to boost capacity and reduce the risk of flooding.
The reinforced concrete structure was protected by a three-metre grass banking at the water’s edge.