Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Top News
Top News

NASA Announces Delays In Artemis Moon Missions

This image provided by NASA shows the Artemis II Orion spacecraft lifted from the Final Assembly and Testing (FAST) Cell and placed in the west altitude chamber inside the Operations and Checkout Buil

NASA has revealed further delays in its plans to send astronauts back to the moon as part of the Artemis program. Administrator Bill Nelson announced that the next mission, which involves flying four astronauts around the moon and back, is now scheduled for April 2026. This date represents a delay from the initial target of September 2025, with various factors contributing to the postponement.

An investigation into heat shield damage from the capsule's test flight two years ago has been a significant factor in the delays. Additionally, improvements to the spacecraft are still required before proceeding with the mission. As a result, the subsequent Artemis mission, which involves a moon landing by two astronauts, has been pushed back to at least 2027, with NASA originally aiming for 2026.

The Artemis program, a successor to the Apollo moon missions of the late 1960s and early 1970s, has so far completed only one mission. In 2022, an empty Orion capsule successfully circled the moon after launching on NASA's new Space Launch System rocket. However, the capsule returned with a damaged heat shield, prompting engineers to identify the cause and develop a plan to address the issue.

Heat shield damage investigation and spacecraft improvements contribute to postponement.
NASA delays moon mission to April 2026 from initial target of September 2025.
Artemis moon landing mission pushed back to at least 2027 from original 2026 goal.
Artemis program, a successor to Apollo missions, has completed only one mission so far.
Upcoming mission to use original heat shield with adjusted reentry path for safety.

For the upcoming mission with four astronauts, NASA plans to use the Orion capsule with its original heat shield but will adjust the reentry path to mitigate potential issues. Replacing the heat shield would have caused a significant delay, hence the decision to proceed with modifications instead. The crew for the lunar fly-around mission includes astronauts from NASA and the Canadian Space Agency.

NASA Administrator Bill Nelson emphasized the importance of maintaining the revised schedule to ensure that the United States lands astronauts on the moon before China, which has set a target of 2030 for a crewed moon landing. Contractors involved in the Artemis program, including SpaceX, have been urged to intensify their efforts to meet the deadlines.

SpaceX's Starship rocket is set to play a crucial role in transporting astronauts from the Orion capsule to the lunar surface during the Artemis missions. The space agency is working diligently to overcome challenges and stay on track with its ambitious lunar exploration goals.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.