A Scottish firm is set to become the first in the UK to build a timber engineering factory that will be powered solely by renewable energy.
NorFrame, the timber frame specialist based in Foveran, Aberdeenshire will manufacture timber kit frames for homes, schools and commercial buildings using power generated from an on-site Anaerobic Digestion plant fuelled by silage from a neighbouring farm – eliminating the need for fossil fuels to heat or power facility and its processes.
Spanning 31,000 sq ft with a completion date of Spring 2023, the £4m factory will initially create 11 new jobs and safeguard a further 14 in a rural area, produce 20 timber kits per week, and have the capability to meet demand from Scotland’s private and public sectors.