Both the M4 Prince of Wales bridge and the M48 Severn Bridge have been shut this morning due to the wind speeds caused by Storm Eunice.
Highways England made the announcement on Twitter at 10.59am and said the closure of the M4 Prince of Wales bridge was necessary due to the wind speeds. The M48 Severn Bridge was already shut by 8am this morning.
The Severn Bridges wrote on Twitter: "For what we believe is the first time due to wind speeds both the #M4 Prince of Wales Bridge and #M48 Severn Bridge are closed to all traffic. Traffic Management teams are heading to site to initiate the closure of the M4. Please do not travel to the location.