Indian Space Research Organisation (ISRO), which is planning to launch the Chandrayaan-3 moon mission in July, has integrated the spacecraft with the launch vehicle — Launch Vehicle Mark-III (LVM3).
On July 5, ISRO tweeted: Today, at Satish Dhawan Space Centre, Sriharikota, the encapsulated assembly containing Chandrayaan-3 is mated with LVM3.
ISRO has, so far, not announced the date of the launch. However, the launch window for the Chandrayaan-3 is between July 12 and 19.