Get all your news in one place.
100’s of premium titles.
One app.
Start reading
InsideEVs
InsideEVs
Technology
EVANNEX

Is Germany Ready For Tesla & Giga Berlin? It's A Bit Complicated

This article comes to us courtesy of EVANNEX, which makes and sells aftermarket Tesla accessories. The opinions expressed therein are not necessarily our own at InsideEVs, nor have we been paid by EVANNEX to publish these articles. We find the company's perspective as an aftermarket supplier of Tesla accessories interesting and are happy to share its content free of charge. Enjoy!

Posted on EVANNEX on March 15, 2022, by Charles Morris

It took a while, but German authorities recently gave Tesla conditional environmental approval to start vehicle production at Gigafactory Berlin, clearing the way for German-made Model 3s and Ys to start hitting the Autobahns. The plant has already assembled around 2,000 prototypes, while Tesla's official delivery "celebration" event is currently slated for March 22nd

Above: A look at the design of Giga Berlin (Source: Tesla)

Nothing is ever settled in a democracy, especially a paperwork-loving one. Tesla has received a 536-page “conditional building permit,” which contains 400 conditions that Tesla needs to meet in order to start production (the application documents reportedly run to 23,700 pages in 66 files).

The company says it expects to deal with all of the conditions over the next few weeks. There will also be a one-month public comment period in which interested parties can lodge objections, and a local environmental group is proceeding with a lawsuit over water usage, but neither of these issues is expected to delay the start of production.

It took a little over two years for the construction of Gigafactory Berlin to be completed—record time for a major factory in Germany, if a little slow by Tesla time. The automaker plans to produce 500,000 vehicles per year at the plant, along with 50 GWh worth of battery cells.

Tesla has already hired about 3,000 workers at the site, and Tesla is in talks with numerous parts suppliers in the region. The company says the headcount will eventually reach around 12,000. Hundreds of jobs for engineers, equipment operators and managers are open.

Gigafactory Berlin is about 100 miles east of Wolfsburg, home base for the Volkswagen Group, Tesla’s biggest rival in Europe, and Herbert Diess and company are not looking on idly. VW has just announced plans to invest two billion euros in a new EV plant in Wolfsburg, which will be dedicated to the company’s new mass-market Trinity EV platform. Construction of the new factory will begin “as early as spring 2023,” and production is slated for 2026.

===

This article originally appeared in Charged. Author: Charles Morris. Sources: ReutersNew York TimesElectrekBarron’sInsideEVs

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.