The finishing touches to a cycling and walking route in Inchinnan are due to be completed within a month.
A section of Greenock Road from the roundabout at Inchinnan Drive to a new active travel bridge over the Black Cart river has been under development.
Existing pavement has been widened to three metres and adapted for shared two-way use by pedestrians and cyclists, while the speed limit has been reduced from 50mph to 40mph and the main carriageway narrowed.