Get all your news in one place.
100's of premium titles.
One app.
Start reading
Manchester Evening News
Manchester Evening News
National
Ethan Davies

Huge 90-tonne bridge successfully lifted into Stockport's new transport hub

An enormous 90-tonne bridge was successfully lifted into place in Stockport over the weekend — connecting the town’s train station to its soon-to-be-built transport interchange.

The vast corten steel pedestrian and cycling bridge was carefully manoeuvred into its final position over Daw Bank using a 750-tonne crane. Because of its sheer size, the bridge was initially delivered in two pieces before being assembled into one complete structure on site.

The bridge is set to open in spring 2024, when the interchange will open its doors. The the 40m-long bridge will provide a traffic-free, accessible route connecting the new interchange to Station Road and onward to the railway station.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.