
The estimated cost of building the London to Birmingham leg of the HS2 high-speed line has increased by £9bn, according to reports.
This could mean the final bill for the first phase of the 225mph railway could reach £80bn at current prices.

The estimated cost of building the London to Birmingham leg of the HS2 high-speed line has increased by £9bn, according to reports.
This could mean the final bill for the first phase of the 225mph railway could reach £80bn at current prices.