Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Al Jazeera
Al Jazeera
Technology

Head of Boeing 737 MAX programme out amid safety concerns at planemaker

An aerial photo shows Boeing 737 MAX planes parked on the tarmac at the Boeing Factory in Renton, Washington [File: Lindsey Wasson/Reuters]

The head of Boeing’s troubled 737 MAX programme has left the planemaker, according to a company memo, amid scrutiny around production and safety measures following a mid-air blowout on a plane last month.

The company also reshuffled its leadership team at the Commercial Airplanes division, according to the memo sent to staff by Boeing Commercial Airplanes (BCA) CEO Stan Deal and first reported by the Seattle Times on Wednesday.

Ed Clark, an 18-year Boeing veteran who was vice president of the MAX programme, will leave the company, the memo said. The Seattle Times reported that he had been pushed out.

Clark is being replaced by Katie Ringgold as vice president and general manager, according to the memo.

Boeing has been scrambling to explain and strengthen its safety procedures after the January accident on a brand new Alaska Airlines 737 MAX 9, in which a cabin panel became detached and flew off in midair.

Clark was general manager at the company’s factory in Renton, Washington, where the plane involved in the accident was completed.

In the memo, Deal said the leadership changes were intended to drive BCA’s “enhanced focus on ensuring that every airplane we deliver meets or exceeds all quality and safety requirements”, The Seattle Times reported.

The leadership changes come in advance of Boeing CEO Dave Calhoun’s planned meeting with US Federal Aviation Authority (FAA) Administrator Mike Whitaker next week after the regulator travelled to Renton to tour the Boeing 737 plant.

The FAA grounded the MAX 9 for several weeks in January and has capped Boeing’s production of the MAX while it audits the planemaker’s manufacturing process.

The door panel that flew off the jet appeared to be missing four key bolts, according to a preliminary report from the US National Safety Transportation Board in early February.

According to the report, the door plug in question was removed to repair rivet damage, but the NTSB has not found evidence the bolts were re-installed.

The panel is a plug on some 737 MAX 9s instead of an additional emergency exit.

This is the second crisis involving Boeing in recent years, after two crashes of MAX planes that killed 346 people.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.