Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
V. Raghavendra

Govt. to set up 29 PSH projects in phases to meet growing demand for power

Facing a persistent shortage of coal that has crippled generation at the thermal power plants, the government is gearing up to set up 29 Pumped Storage Hydropower (PSH) projects with a total capacity of 33,240 MW in a phased manner to meet the growing demand for power in the future.

The techno-commercial feasibility reports have already been prepared for all the projects, while the Detailed Project Reports (DPRs) are being drafted for seven of them having 6,600 MW capacity in the initial stage. Out of these seven projects, four are on river (reservoir based) and three are off-river, according to an official release.

The feasibility and other reports of the first phase PSH projects have bee submitted to the Central Electricity Authority, the Central Water Commission, the Geological Survey of India, and the Central Soil and Materials Research Station for clearances.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.