Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
T. Appala Naidu

Godavari floods: Work on Polavaram irrigation project in A.P. put on hold as inflows rise

Work on the construction of the Polavaram irrigation project has been stopped as the Godavari, Sabari, and Sileru rivers continue to be in spate in the Godavari region in Andhra Pradesh.

The Sabari and Sileru rivers join at Chintoor in Alluri Sitharama Raju (ASR) district before joining the Godavari at V.R. Puram. Consequently, the Polavaram irrigation project receives flood water from the three rivers.

Meanwhile, the second flood warning continued to be in force both at Bhadrachalam in Telangana (where the water level stood at 51.80 feet) and Dowleswaram in Andhra Pradesh on July 28 (Friday).

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.