Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
Special Correspondent

Generation at 80 MW of NTPC Ramagundam solar project goes commercial

Commercial operation of the 42.5 megawatt capacity of the 100 MW floating solar PV project coming up at NTPC Ramagundam has commenced at 00.00 hours on Thursday taking the total capacity operating commercially so far to 80 MW.

The entire 100 MW capacity established in the reservoir waters of the public sector energy company would become commercially operational over the next few months. Of the capacity operational now, 17.5 MW went commercial on October 28 last year and another 20 MW on December 22 last year.

Regional Executive Director of NTPC (South) Naresh Anand complimented Team Ramagundam and reiterated NTPC’s commitment to renewable energy. As part of achieving NTPC’s target of 60 GW of RE capacity by 2032, Southern Region was making concerted efforts. Besides Ramagundam, NTPC-Simhadri (Andhra Pradesh) had already installed 25 MW floating solar power panels, while work was in full swing at NTPC-Kayamkulam (Kerala) on installation of 92 MW floating solar power generation unit, he stated.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.