Get all your news in one place.
100's of premium titles.
One app.
Start reading
Nottingham Post
Nottingham Post
National
Andrew Topping & Jack Thurlow

Frustration at 'ridiculous' wait for Lady Bay Bridge repairs

Angry residents have spoken out after being being told that Lady Bay Bridge could take as long as 12 weeks to reopen following a serious crash which destroyed part of the historic structure. Nottinghamshire County Council reopened part of the bridge in one direction on Monday (July 11), with motorists leaving Nottingham motorists able to use the road heading towards Rushcliffe thanks to the installation of temporary concrete barriers.

The bridge was initially closed in both directions for a week after a lorry crashed off the bridge on July 4. The driver did not suffer life-threatening or life-altering injuries.

Now, local residents have spoken out about the "ridiculous" timescale that has been set for the repairs, and the prospect of even more traffic on football matchdays with the start of the Premier League just around the corner.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.