TRISHULI BAZAAR: Forty workers trapped 3.5km inside the 216MW Upper Trishuli-1 Hydropower Project miraculously survived the Aug 26 flood after a vehicle swept in by the torrent got wedged near the tunnel mouth and blocked the worst of the mud and debris from rushing inside.
Get breaking news anytime, anywhere. Download the TOI app now!