Get all your news in one place.
100's of premium titles.
One app.
Start reading
Chicago Tribune
Chicago Tribune
National
Michael Hawthorne, Adriana Pérez

Costly Deep Tunnel flooding project can’t handle Chicago area’s severe storms fueled by climate change

CHICAGO — Hours before heavy rains swamped Chicago and Cook County suburbs on July 2, the region’s $3.8 billion flood-control project appeared ready as can be to bottle up storm runoff.

The Deep Tunnel’s massive sewers, capable of holding 2.3 billion gallons, were almost empty, according to Metropolitan Water Reclamation District records.

At the end of tunnels hundreds of feet below the Chicago River, Des Plaines River and North Shore Channel, the McCook Reservoir — more than 20 times larger than Soldier Field — was just 17% full of raw sewage and runoff being stored until it could be safely treated.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.