
Plans to transform the NSW energy system and replace coal-fired power is proving to be more costly and will take longer than initially thought.
Energy Minister Penny Sharpe briefed journalists about Labor's network infrastructure strategy, saying she was concerned that costs and time frames had grown since the project was proposed in 2020.