Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Times of India
The Times of India
National
Ram Sundaram | TNN

Chennai: Steel bridge removed to construct new flyovers

CHENNAI: The Foot Over Bridge (FOB) on Old Mahabalipuram Road (OMR), connecting Tidel Park with Thiruvanmiyur railway station, has been temporarily dismantled so that twin U-shaped flyovers can be constructed.

The decision to dismantle and redesign the elevated walkway was taken because the proposed structure was on the way. The steel FOB totally had three arms one on the railway station and other two slides down to connect the MTC bus stop and Ramanujam IT City ( Tidel park)

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.