Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
PTI

Centre to bear 80% dredging work cost of Meghna river: Tripura CM

The Centre has agreed to fund 80% of the total cost for dredging work in river Meghna in Bangladesh side to operationalize the Indo-Bangla waterway connecting river Gomati, Tripura Chief Minister Biplab Kumar Deb has said.

Of the 90-km stretch from Sonamura in Tripura’s Sepahijala district to Daudkandi in Bangladesh, around 40-km riverbed is needed to be dredged to increase the water level.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.