A bold plan to pump sand from Swansea Channel to Nine Mile Beach has been pitched as a possible solution to the devastating impact of ongoing coastal erosion at Blacksmiths Beach.
The Bring Blacksmith Back group is seeking state government support for the installation of a sand transfer system similar to what is used to keep sand on Gold Coast beaches.