ORLANDO, Fla. — NASA made the call Monday to guard against Hurricane Ian and got the slow gears rolling before midnight to send its Artemis I mission hardware back to the garage at Kennedy Space Center.
The 5.75 million-pound, 322-foot-tall combination of Space Launch System rocket, mobile launcher and Orion spacecraft endured yet another 4-mile roll atop NASA’s crawler-transporter 2 back to the Vehicle Assembly Building.
It moved into the VAB after 9 a.m. more than 10 hours since leaving the pad.