Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

AP-Transco staff fix glitches on Gooty-Guntakal line in mission mode

The O&M (operations and maintenance) staff of the AP-Transco restored the 132 KV Gooty receiving station-Guntakal single circuit line which tripped around 8.15 a.m. on April 10 (Wednesday) by 2.45 p.m. 

According to an official release, the line breakdown was declared at 8.20 a.m. after a patrolling gang from Gooty found a Y-Phase conductor snapped. Power was supplied to the domestic consumers in Guntakal and Uravakonda through the alternate 33 KV feeders. 

The power supply was arranged for the railways from the 220 KV Gooty receiving station.

An AP-Transco team rushed to the breakdown site on the Guntakal-Kasapuram village road. They replaced a 100-metre-long conductor and provided a mid-span joint.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.