Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Nottingham Post
Nottingham Post
National
Olimpia Zagnat

All the road closures on A52 in Nottingham as 'essential safety maintenance work' due to start

Road closures will be in place on A52 in Nottingham as maintenance works are due to commence, it has been confirmed.

The essential safety maintenance works will affect a number of sections along the A52 between the M1 Junction 25 and the A1 at Barrowby.

This is to resurface several sections of the carriageway, refresh road markings, install high friction surfacing, replace traffic detection loops, and renew bridge joints.

The works will be taken in several phases, the motorways operator Highways England explained.

This project started in January and is scheduled for completion in March , working between 8pm and 6am, Monday to Friday.

The work is being carried out in phases as outlined below:

  • Phase 1: Wheatcroft to Gamston
  • Phase 2: Wheatcroft to Notts Knight Roundabout
  • Phase 3: Queens Drive exit slip
  • Phase 4: Priory roundabout to QMC
  • Phase 5: Priory roundabout to M1 J25
  • Phase 6: M1 J25 to Priory roundabout
  • Phase 7: Bingham to Barrowby

To read all the biggest and best stories first sign up to read our newsletters here.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.