Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
E.M. Manoj

Validation of LiDAR survey for Kadamanthodu project begins

A four-member expert team from the Kerala Engineering Research Institute (KERI) began validation of the Light, Detection and Ranging (LiDAR) survey conducted recently by the Water Resources department. The survey was conducted as a part of the proposed project to construct a dam across the Kadamanthodu river, a tributary of the Kabani.

The Cauvery Water Disputes Tribunal had awarded 21 tmcft of water to the State from the river basin. The proposed project is aimed at addressing the drought-like situation in Pulpally and Mullankolly areas on the Kerala-Karnataka border during summer and utilising a small amount of water granted by the tribunal.

The LiDAR survey was conducted as a continuation of a survey done by the Geological Survey of India four months ago. The validation processes that started in the reservoir area at Anappara on Friday were completed on Saturday. A team led by T.V. Siji, Deputy Director, Coastal Engineering division, KERI, Peechi, checked the ground control points fixed during the LiDAR survey.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.