Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Independent UK
The Independent UK
National
Maryam Zakir-Hussain

The staggering cost of Oxford railway bridge project that took nearly four years to complete

  • A project to build a railway bridge in Oxford has cost £237.4m, which is nearly £90m more than the inflation-adjusted cost of the London Eye .
  • The final bill significantly exceeded initial estimates of £161m, with construction taking over three and a half years to complete.
  • Botley Road has now reopened to reconnect west Oxford with the city centre after years of closure and severe disruption.
  • Network Rail apologised for the delays, attributing them to unexpected engineering challenges, including Victorian infrastructure and hidden gas leaks.
  • A local campaigner estimated that the prolonged road closure caused local businesses to lose around £50m and resulted in over 120 job losses.

IN FULL

Railway bridge construction project cost more than London Eye and Millennium Bridge

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.