Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Texas Tribune
The Texas Tribune
National
By Martha Pskowski, Inside Climate News

Texas proposes first new rules for oilfield waste in 40 years

Produced water ponds, constructed by Martin Water, and Circle 6 Baptist Camp, top, in Lenorah on Feb. 24, 2024. The Railroad Commission approved the construction of the ponds, used to treat and recycle produced water from fracking, next to the Circle 6 Baptist Camp in the Permian Basin.
The Texas Railroad Commission approved the construction of ponds used to treat and recycle produced water from fracking next to the Circle Six Baptist Camp in Lenorah in the Permian Basin. (Credit: Julian Mancha for The Texas Tribune/Inside Climate News)

This story is published in partnership with Inside Climate News, a nonprofit, independent news organization that covers climate, energy and the environment. Sign up for the ICN newsletter here.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.