Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Times of India
The Times of India
World
TOI World Desk

Tata Steel fire: Massive blaze erupts at UK plant in Port Talbot, staff evacuated safely

A fire broke out at Tata Steel's UK plant in Port Talbot, south Wales, on Wednesday night, prompting a large-scale emergency response as authorities advised nearby residents to remain indoors.

Get breaking news anytime, anywhere. Download the TOI app now!

The fire erupted at around 8 pm local time at one of the steelworks' processing lines, sending thick black smoke billowing across the skyline and drawing nearly 100 emergency responders to the scene.

Tata Steel UK confirmed that all employees were safely evacuated and accounted for, while firefighters continued efforts on Thursday to fully extinguish the fire.

Residents urged to stay indoors

South Wales Police advised people living near the site to keep windows and doors closed as a precaution and avoid the area while emergency operations continued.

Large plumes of smoke were visible across Port Talbot and neighbouring areas. Witnesses described dramatic scenes as the fire lit up the night sky.

"It was very apocalyptic. I couldn't even see the flames because the sky was so black," local resident Kellie Evans told the BBC, adding that several motorists stopped to watch the incident unfold.

Around 100 responders involved in firefighting operation

Rapid Relief Team UK (RRT), which provides emergency support during major incidents, said around 100 responders were involved in tackling the blaze through the night.

The organisation said its volunteers reached the site within 90 minutes of being called and served 125 hot meals to firefighters and emergency personnel working in challenging conditions.

"We are grateful to every responder who attended this demanding and hazardous incident," the group said.

Fire crews from multiple locations, including Neath, Swansea, Llanelli, Carmarthen and Milford Haven, were deployed to support the operation.

Tata Steel rules out link to gas holder demolition

In a statement, Tata Steel said the fire was not connected to the controlled demolition of a redundant gas holder carried out earlier on Wednesday evening.

"The emergency services remain on site and are working with local teams to completely extinguish the fire," the company said, thanking employees and emergency crews for their swift response.

Key Tata Steel site undergoing green transition

The Port Talbot facility is one of the UK's largest steelmaking sites and remains a crucial asset for Tata Steel's European operations.

The plant has been undergoing a major transition after the closure of its two blast furnaces in 2024, a move that resulted in thousands of job losses and sparked concern across the region.

Steel processing activities continue at the site, while construction of a new electric arc furnace, central to Tata Steel's low-carbon steelmaking strategy, is underway and expected to be completed by the end of 2027.

The company said the latest fire occurred at a processing line and that investigations into the cause of the incident are ongoing.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.