Residents of Honnetalu in Thirthahalli taluk of Shimogga district in Karnataka have alleged that upgradation of the road connecting their village to Durga Parameshwari temple had been poorly executed. Within a couple of months of the road being laid, the surface is coming undone resulting in formation of potholes.
The 800-metre stretch, connecting Honnetalu to the temple, was laid in March 2022 under the Pradhan Mantri Gramin Sadak Yojna (PMGSY). “We were hoping that the work under PMGSY would be of good quality. But, the contractor, who got the contract, has been negligent. The top layer can be removed with your bare hands; no tool is required,” said Nityanand, a resident of Honnetalu.
The work was executed at a cost of ₹50 lakh.