
A 161-year-old London railway bridge is to be refurbished from Thursday, Network Rail has said.
Hungerford Bridge, the structure that takes the railway over the Thames between the South Bank and London Charing Cross station, will be restored, with work expected to be completed by the end of winter 2028.