Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
Special Correspondent

Rain hits SCCL coal output

PEDDAPALLI/BHADRADRI-KOTHAGUDEM

Incessant rains over the past five days have dealt a major blow to coal production in almost all the opencast projects (OCPs) of the State-owned Singareni Collieries Company Limited (SCCL).

The intense spell of heavy rains that battered the coal belt region, spanning six districts, last week virtually stalled coal production as well as overburden removal in as many as 19 OCPs spread across 11 areas of the SCCL. The extensive water-logging and slushy conditions in almost all the OCPs hampered blasting operations, a vital component of surface mining, and also hit operations of heavy machinery, sources said.

According to SCCL sources, the SCCL’s OCPs together suffered a coal production loss to the tune of 4 lakh tonnes in the past one week. However, the loss suffered by the coal mining giant in terms of coal output and overburden removal owing to heavy rains is estimated to be several times more.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.