Get all your news in one place.
100's of premium titles.
One app.
Start reading
International Business Times UK
International Business Times UK
Regyl Jaen

£430M Undersea Cable Diverted After Harry Potter Fans Say: 'Leave Dobby's Grave Alone'

A fictional elf’s ‘grave’ at Freshwater West Beach became an unlikely obstacle for a £430M power cable after fans flooded the company with hundreds of calls. (Credit: via nohomejustroam.com)

A £430M power project connecting Britain and Ireland was rerouted after Harry Potter fans raised concerns that its proposed route would pass through a makeshift memorial to Dobby, the much-loved house elf.

Known as the Greenlink interconnector, the project connects Great Britain and Ireland's electricity grids via 190km of subsea and underground cables. The route links County Wexford with Pembrokeshire, where the cable makes landfall at Freshwater West. The Welsh beach served as the filming location for Dobby's death and burial scenes in Harry Potter and the Deathly Hallows. The 500MW link became operational in early 2025.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.